Customization: | Available |
---|---|
Certification: | CE, ISO |
Customized: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
General information: |
||
1 | Purpose of the station | oxygen station |
Requirements for execution: |
||
2 | The maximum dimensions of the block unit, m: | 4000х 8000х4000 |
3 | Execution type (frame type of sandwich panels 20 foot railway container, 40 foot railway container on the frame, more) |
sandwich panels |
4 | Type of execution (stationary, on a sled, on the chassis, other) | stationary |
5 | Maximum ambient temperature, 0C: | 600С |
Minimum ambient temperature 0C: | -30 0С | |
6 | Station installation area: | Outside of industrial building |
7 | The maximum permissible electric power station / unit, kW: | 110 kW |
Requirements for compressor plants: |
||
15 | The necessity of reserving compressor units (yes / no) | Yes |
Requirements for compressed air and oxygen at the exit of the station: |
||
16 | The maximum working pressure of the compressedoxygen excessive,MPa: |
13 bar |
17 | Oxygen production, Nm3/hour: | 200 |
18 | Clearness of compressed oxygen | 90-99% |
19 | The dew point of the compressed oxygen, 0C: | - minus 40 ,70 |
20 | The need to produce more compressed air (yes / no) | No |
The maximum working compressed air pressure, excessive,MPa: | 10-12 bar | |
Consumption of compressed air Nm 3 / min | 1.7mз | |
The required cleanliness class of compressed air | 99-100% | |
21 | The need for backup oxygen generators (yes / no) | Yes |
No | Name | Name | Qty | Remark |
1 | Air Filter | 60000m3/h | 1 set | 1 |
2 | Air Compressor Unit | 17000Nm3/h | 2 set | 2 |
3 | Air Pre-cooling System | 1 set | 1 | |
4 | Molecular Sieve Purifying System | 1 set | 1 | |
5 | Distillation tower | 1 set | 1 | |
6 | Booster Turbo Expander | 2 set | 2 | |
7 | Low Pressure Snubber | 1 set | 1 | |
8 | Oxygen Compressor | 3 set | 3 | |
9 | Gaseous oxygen storage tank | 200m3, 3.0Mpa | 3 set | 3 |
10 | Liquid Oxygen tank | 1 set | 1 | |
11 | Liquid Oxygen Pump | 1 set | 1 | |
12 | Nitrogen Compressor | 2 set | 2 | |
13 | Gaseous Nitrogen tank | 200m3, 3.0Mpa | 1 set | 1 |
14 | Liquid Nitrogen Pump | 1 set | 1 | |
15 | Filling equipment | 1 set | 1 | |
16 | Charge Oxygen Compressor | 1 set | 1 | |
17 | Liquid Ar. Storage Tank | 1 set | 1 | |
18 | Vaporizer | 1 set | 1 | |
19 | Filling equipment | 1 set | 1 | |
20 | Gaseous Argon storage tank | 20m3, 3.0Mpa | 1 set | 1 |
21 | PLC Control System | 1 set | 1 | |
22 | H.V panel | 7 set | 7 | |
23 | Instrumental Control System | 1 set | 1 |