Lf-70t Ladle Refining Furnace Specification

Product Details
Customization: Available
Certification: CE, ISO, CE, ISO
Customized: Customized
Manufacturer/Factory, Trading Company, Group Corporation
Gold Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Lf-70t Ladle Refining Furnace Specification
  • Lf-70t Ladle Refining Furnace Specification
  • Lf-70t Ladle Refining Furnace Specification
  • Lf-70t Ladle Refining Furnace Specification
  • Lf-70t Ladle Refining Furnace Specification
  • Lf-70t Ladle Refining Furnace Specification
Find Similar Products

Basic Info.

Model NO.
LF-70t
Fuel
Gas Coal Electric, Electric
Range of Applications
Industrial, Industrial
Type
Cusomized, Electric Arc Furnace
Place Style
Vertical
Usage
Steel Making Plant
Transport Package
Nude, Wooden Cases
Specification
As per drawing
Trademark
Ville Industry
Origin
China
HS Code
851300020
Production Capacity
30units Per Year

Product Description

Lf-70t Ladle Refining Furnace Specification
1. Overview:

Features of ladle refining furnace: electric arc heating, temperature measuring and sampling, bottom argon blow stirring, contents microscale adjustment, wires feeding, control production steps of steel making and casting.
2. Main function of the equipment
    1. Heating by Arc to raise the temperature of molten steel under normal atmosphere, temperature measuring and sampling by manual.
    2. Bottom bubbling by Argon, to achieve the temperature and composition even and clean.
    3. It can be slightly adjust the quantity of alloy, to control accurately and meet the final chemical compositions as required.
    4. With the wire feeder, making desulfurizationde-oxidizing of the molten steel, to change the form and distribution of the inclusions and control the alloying element accurately, meanwhile can raise the recovery up of the alloy,minimize the temperature drop and minimize the environmental pollution.
    5. Reserving for the dust collecting system.
    6. As a buffer to adjust the melting and casting time to achieve continuous casting successfully.
3. Main Technical Parameter
Ladle rated capacity 70T
Free board 500mm
ladle car travel speed 3-20m/min
ladle car driving method VVVF
ladle car position accuracy ±10mm
Electrode diameter Ф400mm
Pitch circle diameter Ф700mm
Electrode lifting distance 2300mm  
Electrode travel speed 4m/min(up, auto)
3m/min(down,auto)
Temperature rising rate 4ºC 
Transformer capacity 12MVA+20%
Primary voltage 33KV, 3 P, 50Hz
Number of taps and voltage steps 7 (Off load tap changer)
Type of cooling OFWF



2. Supply list
SN Item Qty Remark
1 Mechnical parts    
1.1 Furnace body (upper shell and lower shell) 1 set  
1.2 Tilting mechanism 1 set  
1.3 Water cooled roof and water pipe 1 set Tubular, Hongxinyuan
1.4 Roof lifting and rotating mechanism 1 set  
1.6 EBT platform 1 set  
1.7 Rotation frame locking device 1 set  
1.8 Feeding hopper(on the roof) 1 set  
1.9 Electrode nippling station 1 set 4 nos., 
1.10 Cooling water distributor 1 set  
2 Electrical parts    
2.1 Transformer 40MVA/20kV c/w hydro-oil cooler 1 set China top make
2.2 20kV high voltage system (GBC40.5kV panel) 1 set china VCB
2.3 Short network 1 set  
2.4 Lower voltage system 1 set  
2.5 PLC automation and HMI system 1 set Siemens PLC S7-300
3 Auxiliary items    
3.1 Hydraulic power pack 1 set Proportional valve & pump make: Parker
3.2 Compressed air device 1 set  
3.3 Lubrication station 1 set  
3.4 Water cooled door oxygen lance 1 set with hydraulic station
3.5 CNG, oxygen, carbon wall lance (3 pcs.) 1 set with valves stand
3.6 Steel temperature & measuring thermometer 1 set with LED display
 
Supplied by the Buyer:
1) Installation and installation materials, Hydraulic medium, lubrication medium and cleaning medium, Graphite
    electrodes, Furnace refractory lining;
2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded
    furnace foundation parts;
3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V. incoming line is
    connected to Seller's H.V. panel and furnace transformer terminals, L.V. line is connected to Seller's L.V.
   distribution panel.


Workshop
Lf-70t Ladle Refining Furnace Specification

Lf-70t Ladle Refining Furnace Specification

Lf-70t Ladle Refining Furnace Specification


Sales team:
Lf-70t Ladle Refining Furnace Specification

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier